welcome to the official website of ChangYi KaiTe New Material Co.,ltd.
中文
EN
Recruit
Network
HOME
ABOUT
Company Profile
Culture
Company Building
Production plant
SPEECH
General Manager Speech
PRODUCT
Sulfur tolerant shift catalyst and protective agent
NEWS
Company News
Industry News
knowledge
HONOR
Qualification certificate
Honorary plaque
Awards won
CONTACT
Contact Us
News
Focus on industry information and company trends
Company News
Industry News
knowledge
Transform reaction mechanism
Curing conditions on catalyst activity and lifetime are important early influence. Dry air curing, the HS is high enough temperatures to strengthen the sulfide concentration and activity of the catalyst is essential to improve the basic conditions. The only mandatory curing it possible to obtain go
2013-08-15 08:49:21
Catalytic mechanism of sulfide
Curing catalyst, the use of hydrogen gas (H volume fraction greater than or equal to 25 9,5, o volume fraction less than or equal to 0.5) as the carrier gas (such as dry or semi-water gas shift gas), together with the amount of CS , heated by the furnace through the catalyst bed after warming, curi
2013-08-10 08:49:21
The process of the transformation reaction conditions
Cobalt a sulfur-tolerant catalysts such as aluminum and iron in a conventional chromium and copper-zincShift catalyst, compared with operating flexibility, high activity, easy inToxic, ulfur-free limit and so on. A) very good low-temperature activity. Aluminum, cobalt a sulfur-tolerant catalysts
2013-08-09 08:49:21
Sulfur-tolerant shift catalyst of sulfide
China's abundant coal resources, raw materials, oil, residual oil content is high, due to Therefore, the development of residual oil or coal as raw materials, production of sulfur-tolerant shift process Such as synthesis gas or ammonia smell with a wide prospect. China in the World 2O
2013-08-03 08:49:21
Sulfur-tolerant shift catalyst loading program
A Catalyst loading conditions to be satisfied before the matters and confirm 1! Confirm the export of metal mesh collector well, 2, the thermocouple protection tube intact, 3, catalyst unloading pipe blind flange has been reset, 4, the furnace clean, and change the system should ensure a thorough p
2013-08-01 08:49:21
NAV
HOME
CONTACT
ENG
ESC OR
X
MAP NAVIGATION
HOME
ABOUT
SPEECH
PRODUCT
NEWS
HONOR
Recruit
Network
CONTACT